![]() With the completion of the Waterbury Branch Signalization project upgrading capacity for future 30 minute service headways, Governor Lamont announced on Novemthat 7 new trains will be coming to the Waterbury Line in 2022 and the Derby-Shelton Train Station was a priority in getting new riders onto the line. The 75-space parking lot is managed by the Naugatuck Valley Council of Governments. The station is owned and operated by the Connecticut Department of Transportation, but Metro-North is responsible for maintaining platform lighting as well as trash and snow removal. The station has one three-car-long low-level side platform to the west of the single track. It is the southernmost stop on the Waterbury Branch before trains merge onto the Northeast Corridor. August 2006.Derby–Shelton station (signed as Derby/Shelton) is a commuter rail station on the Waterbury Branch of the Metro-North Railroad New Haven Line, serving the cities of Derby and Shelton, Connecticut. ^ "Metro-North Railroad Track & Structures Department Track Charts Maintenance Program Interlocking Diagrams & Yard Diagrams 2015" (PDF).^ Amtrak OctoSchedule (Museum of Railway Timetables).^ Amtrak ApSchedule (Museum of Railway Timetables).^ Amtrak JSchedule (Museum of Railway Timetables).^ Port Chester NYW&B Station (New York, Westchester and Boston Railway website). ![]() ^ Rye NYW&B Station (New York, Westchester and Boston Railway website).Market Analysis/Fare Policy Group:OPERATIONS PLANNING AND ANALYSIS DEPARTMENT: Metro-North Railroad. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |